Cookie preferences
This website uses cookies, which are necessary for the technical operation of the website and are always set. Other cookies, which increase the comfort when using this website, are used for direct advertising or to facilitate interaction with other websites and social networks, are only set with your consent.
Configuration
Technically required
These cookies are necessary for the basic functions of the shop.
"Allow all cookies" cookie
"Decline all cookies" cookie
CSRF token
Cookie preferences
Currency change
Customer recognition
Customer-specific caching
Individual prices
Selected shop
Session
Comfort functions
These cookies are used to make the shopping experience even more appealing, for example for the recognition of the visitor.
Note
Statistics & Tracking
Affiliate program
Track device being used
Finley GRS RPET Laptop Backpack
from
€13.45
excl. imprint
WoW! Backpack made from sturdy 600D RPET polyester. Equipped with a spacious compartment with... more
WoW! Backpack made from sturdy 600D RPET polyester. Equipped with a spacious compartment with sturdy zip and a foam protective compartment for safely transporting a laptop with a screen size of up to 15.6 inches. In addition, this backpack has an extra zip pocket on the front and a handy carrying loop. The adjustable shoulder straps and the rear of the backpack are foam padded for extra comfort. The backpack is also finished with mesh fabric. GRS-certified. Total recycled material: 98%. Capacity approx.15 litres.
Properties
Weight: | 400 g |
Length: | 290 mm |
Width: | 130 mm |
Height: | 430 mm |
Customs tariff number: | 4202929190 |
Coutry of origin: | CN |
Material: | 600 D RPET polyester |
Production time: |
- above zipper (max 180 x 120 mm), silkscreen print: Production time 4 working days after final approval - on zipper (max 150 x 120 mm), silkscreen print: Production time 4 working days after final approval - on zipper (max 120 x 70 mm), digital transfer: Production time 5 working days after final approval - above zipper (max 90 x 90 mm), digital transfer: Production time 5 working days after final approval |
Eco: | Yes |
Viewed